License#:EC MOONEC*994MC

×

 

Sub panel installation involves the process of adding a secondary electrical panel to an existing electrical system. It is commonly done when there is a need for additional circuits or when the main electrical panel is already at its capacity. Here’s an overview of the sub panel installation process:

  1. Determine the Need: Assess the electrical requirements and load demands of the area or equipment that will be powered by the sub panel. Consider factors such as the number of circuits needed, the type of loads (e.g., lighting, appliances, machinery), and the total power requirements.
  2. Choose the Sub Panel: Select an appropriate sub panel that meets the electrical needs. Consider factors such as the panel’s amperage rating, number of available slots for circuit breakers, and compatibility with the existing electrical system.
  3. Plan the Installation: Decide on the location for the sub panel installation. It is typically placed near the area it will serve, such as a workshop, addition, or detached garage. Ensure that the chosen location meets electrical code requirements and allows for proper access and ventilation.
  4. Obtain Permits and Consult an Electrician: Before proceeding with the installation, it’s essential to obtain the necessary permits from the local building authority. It’s recommended to consult a licensed electrician who can provide guidance, ensure compliance with electrical codes, and assist with the installation process.
  5. Shut Off Power: Turn off the main power supply to the existing electrical panel. This step is crucial for safety and should not be skipped.
  6. Install the Sub Panel: Mount the sub panel securely to the wall or surface according to the manufacturer’s instructions. Connect the grounding wire from the main panel to the grounding bar in the sub panel. Run appropriate-sized feeder wires from the main panel to the sub panel, making sure to follow proper wiring methods and code requirements.
  7. Wire the Circuits: Install the circuit breakers in the sub panel and connect the branch circuit wires to their respective breakers. Each circuit should be labeled for easy identification.
  8. Test and Verify: Once the wiring is complete, carefully double-check all connections to ensure they are secure and properly tightened. Restore power to the main panel and test the sub panel circuits to ensure they are functioning correctly.
  9. Final Inspection: Contact the local building authority to schedule a final inspection of the sub panel installation. This step ensures that the installation meets the required safety standards and electrical codes.

It is important to note that sub panel installation can be a complex electrical task and may require the expertise of a qualified electrician. Working with a professional ensures the job is done safely, and all electrical requirements are met.